Virtual University of Pakistan (VU) 

Mid Term Paper Fall 2018 From 22 December 2018 to 06 January 2019

Share Your Current Mid Term Paper in Reply of this Discussion

Tags: 06, 2018, 2019, 22, CS605, December, EngineeringII, Fall, From, January, More…Mid, Paper, Software, Term, to

Views: 65

Replies to This Discussion

(Q-3) For a nuclear reactor control system, identify at least two catastrophic-nature technical risks.

(Q-3) A software development organization undertakes an emergency management system. Different parts of the system are supposed to be developed in different languages, after which they will be integrated. Which sizing methodology will you prefer to calculate the overall size of this application?

(Q-5) Do you think that the use of statistical control techniques like the one given by Walter Shewart is valid (from accuracy point of view) in domain like software engineering? give your comments.

(Q-5) Two most widely used metrics for the measurement of software size are function points (FP) and lines of code (LOC). As per your opinion, which of them is more appropriate for measuring the size of applications? Provide reason(s) for your answer.

(Q-5) Identify construction and Management activities from the list of activities given below:

  1. Requirement Gathering
  2. Software Quality Assurance
  3. Design Development
  4. Installation and Training
  5. Coding

RSS

SPONSORED LINKS

SPONSORED LINKS

© 2019   Created by Irfan Khan MSCS.   Powered by

Badges  |  Report an Issue  |  Terms of Service